Below is a general guide to the different stages of house construction, every house we build is different, however, for example we may be also building your pool, landscaping or your house may bay on stumps so the stages may vary at times.
Stage 1 – Preparation of block ready to commence construction
Stage 2 - Installation of footings and underground drainage and electrical connection
Stage 3 – Installation of base
Stage 4 – Frame stage (frame and trusses)
Stage 5 – Installation of External windows/doors/brickwork & cladding
Stage 6 – Installation of internal linings
Stage 7 – Installation of internal doors and trim/ installation of kitchen and vanities/installation of wet area tiling
Stage 8 – Practical completion – At this stage the house is generally complete except for minor trade touch ups
Stage 9 – Handover – this is the day you have been waiting for, handover day, is generally a formality, as we have kept in contact with you, during construction and especially so, between practical completion and handover stage.